Industry

AI agents and systems for manufacturers

In a manufacturing company, AI pays off first in the work around production: answering customers about order status, estimating delivery dates from real data, and joining up what the ERP, the time clock and the plant already record. Fractional builds those agents and systems on top of the production ERP, for furniture makers such as GICAMOB and Wewood and for Cleanup's industrial laundry.

Manufacturing clients
GICAMOB, Wewood, Cleanup
Connects to
Production ERP, time clock, RFID readers
First use cases live
6 to 8 weeks
01The problem

In the plant, the data exists, spread across systems that do not talk to each other.

  1. The production ERP, the planning sheets, the time clock and the machines each record their own part.
  2. Promised delivery dates rarely match what production can do, and the customer finds out first.
  3. A large part of the sales team's day goes on answering questions about orders.
  4. Counts, weights and quantities are retyped by hand between the plant, dispatch and invoicing.
02How it works

Where an AI project in a plant starts.

  1. 01

    Visit and process map

    From order entry to dispatch, phase by phase, to find the real bottlenecks before automating.

  2. 02

    Connect existing data

    Production ERP, planning, clock-ins and readers, with read-only access.

  3. 03

    First agents

    The ones that free most time: replies to customers about orders, lead times from history, invoices read by AI.

  4. 04

    Production visibility

    Each order's status, phase times and alerts when a deadline is going to be missed.

03Clients

Manufacturers and industrial operations with systems in production.

  • GICAMOBFurniture manufacturing

    Customer successoperated by AI

    Furniture manufacturer selling to retailers. An email agent recognises the shop writing in, finds the order in the production ERP (GPAC) and drafts the reply with its real status. A board shows every order, and a first dashboard estimates delivery times per product type.

    Read the case study →
  • WewoodFurniture · Retail

    CRM 360AI-assisted sales

    Makes and sells furniture. The CRM takes in leads from the website, researches each company, builds quotes from the live catalogue and keeps sales in line with accounting.

    Read the case study →
  • cleanupIndustrial laundry

    End-to-endfrom plant floor to accounting

    Industrial laundry serving hotels. RFID readers, weighing, planning, dispatch and invoicing in one flow, with supplier invoices read by AI and reconciled against the bank.

  • itm globalEngineering · Site work

    Automatichours and travel per site

    Engineering and construction. Timesheets, travel and absences recorded automatically by project and by site.

We'll show you how this would work with your systems.

Thirty minutes are enough to identify the highest-value processes and frame a first engagement.

Get in touch →
04Integrations and modules

Connected to the systems a plant already has.

Connects to

  • GPAC
  • Sage
  • Planning spreadsheets
  • Time clock
  • RFID readers
  • Laundry software
  • Email (Outlook and IMAP)

Access to the production ERP starts read-only. Nothing changes in how the plant records its work until the team decides it should.

Modules

  • Customer email agentReplies with the real status of each order.
  • Order boardEvery order, phase by phase, on one screen.
  • Delivery estimateLead times estimated from orders already delivered.
  • RFID trackingEvery item read on arrival, linked to customer, service and price.
  • Invoices and reconciliationSupplier invoices read by AI and matched to the bank movement.
05Engagement timeline

Impact is demonstrated in weeks, before scaling into the full transformation.

  1. 6-8 weeks

    Value foundation

    Two to three use cases in production within weeks, impact measured against baseline.

  2. 1-2 weeks

    Evaluation and decision

    A reasoned decision on the full transformation, made on verified results rather than projections.

  3. 6-12 months

    Full transformation

    The operating core is rebuilt in phases sequenced by value, with legacy tools retired as agents reach production.

  4. Ongoing

    Operation and transition

    The system transitions fully to the organisation, which operates and extends it autonomously.

06Frequently asked questions

What people ask us before starting.

Where should a manufacturer start?

With the process that loses most time to data that already exists. In many plants that is order status: the ERP knows the answer, but someone has to fetch it every time a customer asks.

Do we need new sensors or an MES?

Not always. We start with what the ERP, planning sheets and time clock already record. Sensors, cameras or an MES come in only if that data falls short.

Do you work with our production ERP?

We have connections in production with GPAC and Sage. For another ERP, we connect through its API, the database with read-only access or the exports that already exist.

Is public funding available for these projects?

In Portugal, sometimes. Dehouse's system was funded by the IA nas PME line of the Recovery and Resilience Plan. Funding lines open and close by call, so check with your grants adviser what is open before counting on it.

How long until there are results?

The first two or three use cases go live in 6 to 8 weeks, measured against how the plant worked before.

07Talk to us

Thirty minutes about your plant.

Tell us where most time goes, between orders, production and invoicing. We leave the call with a first process to tackle.

What happens next

  1. We reply within one working dayA short reply with a proposed time, not an automated sequence.
  2. A 30-minute conversationWe map how the company runs today and where the hours go.
  3. A plan with an order and a costYou leave with the highest-value processes identified and a first engagement framed.