Production monitoring and computer vision quality control
A production monitoring system brings what the ERP, the planning sheets and the time clock already record onto one screen: each order's status, phase by phase, the real times and the orders at risk of running late. Computer vision comes in where a camera sees what no record captures, such as parts leaving a phase or visible defects. We start from the data the plant already has: at GICAMOB, delivery dates are already estimated from the production ERP's real history.
- Starts with
- ERP, planning and time-clock data
- ERP access
- Read-only
- Computer vision
- Where a camera adds what the records miss
The plant records a lot, yet the delivery date is still a guess.
- The ERP knows when an order came in and when it shipped, but not the cutting, machining or assembly in between.
- Clock-in data exists, sometimes years of it, and is not connected to production control.
- Time per part or per unit swings from week to week, and nobody can say why.
- Delays are discovered when the customer calls to ask about the order.
From the data the plant already has to a screen that warns before the delay.
- 01
Map the flow
From order entry to dispatch, phase by phase, to find the bottlenecks before installing sensors or cameras.
- 02
Connect what exists
Production ERP, planning sheets, time clock and machine logs, with read-only access.
- 03
Show and predict
Each order's status, real phase times and delivery dates from history, with alerts when an order is going to miss its date.
- 04
Add vision where it pays
Cameras with computer vision to count parts, confirm a phase is done or detect visible defects, where the records fall short.
What is already in production.
At GICAMOB, cameras and machines count every phase of the line, from raw board to dispatch, and the production monitor shows queues, stops and orders at risk.
Furniture manufacturingCustomer successoperated by AI
A read-only connector to GPAC, the production ERP, feeds the order board and the lead times per product type. The machines report state and parts, five cameras count the phases where parts move by hand, and three robot cells do the heavy handling.
Read the case study →
Industrial laundryEnd-to-endfrom plant floor to accounting
In Cleanup's plant, collection, sorting, weighing, planning, processing and dispatch run as one flow, and the day's plan is built from the volume read by RFID, the contracted deadlines and installed capacity.
Engineering · Site workAutomatichours and travel per site
Hours, travel and absences recorded automatically by project and by site: the basis for knowing how long the work actually took.
We'll show you how this would work with your systems.
Thirty minutes are enough to identify the highest-value processes and frame a first engagement.
Get in touch →A plant's data sources, connected to one system.
Connects to
- GPAC
- Planning spreadsheets
- Time clock
- RFID readers
- IP cameras
In production: GPAC, planning spreadsheets, time clock, RFID readers and IP cameras, with the counting done on site.
Modules
- Order boardEvery order's status, phase by phase, on one screen.
- Phase timesHow long each phase took, from production records and clock-ins.
- Delivery estimateDelivery time per product type, from orders already delivered.
- Delay alertsWarns the team when an order no longer fits the promised date.
- Computer visionPart counting and visible-defect detection, where records fall short.
Impact is demonstrated in weeks, before scaling into the full transformation.
- 6-8 weeks
Value foundation
Two to three use cases in production within weeks, impact measured against baseline.
- 1-2 weeks
Evaluation and decision
A reasoned decision on the full transformation, made on verified results rather than projections.
- 6-12 months
Full transformation
The operating core is rebuilt in phases sequenced by value, with legacy tools retired as agents reach production.
- Ongoing
Operation and transition
The system transitions fully to the organisation, which operates and extends it autonomously.
What people ask us before starting.
Do we need an MES to monitor production?
Not always. Many manufacturers already record enough in the ERP, planning sheets and time clock. The first step is to bring that data together and see what is missing; new sensors or an MES only make sense if existing data is not enough.
Do you have computer vision in production?
Yes. At GICAMOB, five cameras count parts where they change hands, and a small edge box beside each one does the counting on site. It is still the last layer: we propose it after mapping the process and connecting the existing data, because only then is it clear where a camera adds information.
How is the delivery date estimated?
From real history: how long orders for the same product type took, outliers removed, and how much that time varies. That is what we did with GPAC data at GICAMOB.
Does the system change data in the ERP?
No. Access to the production ERP is read-only.
How long does it take?
The first two or three use cases go live in 6 to 8 weeks. In a plant, the first is usually order status and phase times, because they use data that already exists.
Show us what your plant already records.
ERP, planning sheets, time clock. In thirty minutes we see what visibility that data already allows and what is missing.
What happens next
- We reply within one working dayA short reply with a proposed time, not an automated sequence.
- A 30-minute conversationWe map how the company runs today and where the hours go.
- A plan with an order and a costYou leave with the highest-value processes identified and a first engagement framed.
Received. We will be in touch.
We reply within one working day, with a proposed time and the questions we want to cover.