From raw board to assembled furniture, every phase counted.
GICAMOB makes wooden furniture in Gandra, Paredes, and sells it to retailers. We built the system it runs on, from the shops’ inbox to the factory floor: an email agent drafts replies with the real status of each order, the machines are connected, every phase is counted by a camera or by the machine itself, and robot arms do the heavy handling.
Units per hour, by phase
Last hour · from cameras and machine counters · dashed line is the plan
Queue before painting: 46 parts, about 1 h 10 min of work at the current pace
What we built · One system
- Email agent
- Drafts replies to shops with the real order status from the production ERP.
- Order board
- Every order and where it stands, in one view.
- Lead times
- Delivery estimates per product type, from orders already delivered.
- Production monitor
- Every phase in real time, with delays and bottlenecks flagged early.
- Machines connected
- The CNC and the line machines report state, jobs and counts.
- Cameras and robot arms
- Every phase counted, and arms on the heavy handling.
- 10
- phases on one line, from raw board to truck
- 5
- cameras where parts change hands
- 3
- robot cells on the heavy handling
- 1
- system, from the shop’s inbox to the robot
The challenge
- 01
Shops asked where their order was, often more than once. The answer depended on someone checking.
- 02
The ERP knew each order. It did not see the line while the work was happening.
- 03
A delay showed up at the truck, not at the phase where it started.
- 04
Moving boards in and out of machines was heavy, repetitive work.
Raw boards in at one end. Furniture out at the other.
Ten phases on one line, each one counted: by a camera where parts move by hand, by the machine itself where it can report. Robot arms take the heavy handling: loading the CNC, feeding the paint line, palletising.
- 1
Raw boards in
Raw boards arrive from the suppliers. Each order’s cutting list is already in the ERP.
- 2
Cutting
The beam saw cuts to the list the order sends, and a camera counts the parts cut per hour.
- 3
CNC machining
A robot arm loads the CNC. The job comes from the order, and the machine reports the parts it makes.
- 4
Edge banding
The edge bander reports its state as it runs, and the metres of edge it lays.
- 5
Sanding
The wide-belt sander says when it stops and why, a belt change for one.
- 6
Painting
A robot arm feeds the paint line, and the queue before the booth is counted in parts and in minutes.
- 7
Drying
The drying tunnel reports its temperature and how long each pass takes.
- 8
Assembly
People assemble the furniture, and a camera counts the units assembled per hour.
- 9
Quality and packing
Quality and packing stay with people. A camera counts the units packed, and a robot arm palletises the boxes.
- 10
Dispatch
The pallets go out to the shops, order by order, ready to load.
- What a camera sees
- ReadWhat it counts
- DeviceA machine, a robot arm, a truck
- The route of the parts
What every camera sees
Units per hour.
Counted as parts cross.
Queues and stops.
What waits, and where nothing moves.
Parts, not people.
Images stay on site.
The CNC gets its job from the order, and says when it is done.
Every machine reports its state, the job it is running and the parts it has made. Where the controller allows it, we read it directly. Older machines have a small sensor box. Either way, the production monitor sees the whole line on one screen.
Machines
Today · 14:37 · 6 running, 1 idle, 1 stopped
- Beam sawRunningCutting list 120418 · 212 parts today
- CNC 1RunningALBA sideboard · tops · 34 of 48
- CNC 2Idle 6 minWaiting for boards from the saw
- Edge banderRunning1,140 m of edge today
- Wide-belt sanderStoppedBelt change · 12 min
- Spray boothRunningLacquer, white matt · 22 °C
- Drying tunnelRunning45 °C · 38 min per pass
- Robot cell 1RunningLoading CNC 1 · 186 cycles today
CNC 1 · job queue
Jobs come from the orders, in the order they are due
| Order | Job | Parts | Due |
|---|---|---|---|
| 120418 | ALBA sideboard · tops | 34 / 48 | Thu |
| 120418 | ALBA sideboard · sides | 0 / 96 | Thu |
| 120433 | COSTA bedside · fronts | 0 / 64 | Fri |
| 120440 | NORA bench · seats | 0 / 24 | Mon |
Service due in about 88 hours. Suggested slot: Saturday morning
What is read
State, job, parts, alarms.
Running, idle or stopped, with the reason when the machine gives one. The job it is on and how many parts are done.
What is sent
The next job, from the order.
The cutting list for the saw and the program for the CNC come from the order. Nobody retypes them at the machine.
What it prevents
A stop nobody planned.
Hours on the spindle, metres of edge and belt changes are counted, so service lands in a quiet slot.
Units per hour, phase by phase, counted on their own.
Where parts move by hand or on trolleys, a camera counts what passes and sees what waits. Connected machines count their own. Every count reaches the production monitor by the minute, next to the order it belongs to.
What the camera sees
Each part that crosses the line is counted once
- Trolley label
- Order 120418 · ALBA tops
- Parts this hour
- 41 · plan 40
- Last part
- 14:37:09
Since 06:00, by phase
Each bar is one hour · the last one is now
Painting has run below plan for 4 hours. Queue before the booth:46 parts
Sanding stopped 12 min at 12:20 · belt change, from the machine
The line right now · per hour, and what waits between phases
- Cutting64parts / h
- 18waiting
- CNC41parts / h
- 6waiting
- Edge banding118parts / h
- 9waiting
- Sanding96parts / h
- 46waiting
- Painting38parts / h
- 4waiting
- Drying36parts / h
- 12waiting
- Assembly9units / h
- 1waiting
- Packing9units / h
Running, slow and stopped, since 06:00
From the cameras and the machines, nobody writes it down
- Running
- Below plan or waiting
- Stopped
A line, not a guess.
Each camera watches the exit of its phase and counts a part once, when it crosses.
Tied to the order.
Every trolley carries its order label, so each count lands on the order it belongs to.
Queues you can see.
What waits between two phases, in parts and in minutes of work at the current pace.
On site.
A small edge box beside each camera does the counting. Images stay in the factory.
The arms do the lifting. People keep the craft.
Three cells take the heavy, repetitive handling: loading and unloading the CNC, feeding the paint line, and palletising boxes at the end. Each cell is fenced, stops when someone steps in, and reports every cycle to the same monitor.
| Cell | Doing | Today | Stops |
|---|---|---|---|
| 1 · CNC loading | Running | 186 cycles | 0 |
| 2 · Paint line | Running | 140 parts | 1 |
| 3 · Palletising | Waiting | 52 boxes | 0 |
Cell 2 stopped 2 min at 11:08 · light curtain, someone entered · restarted by the operator
What the arms do.
Lift boards onto the CNC and take the parts off, put sanded parts on the paint trolleys, stack boxes on pallets.
What stays with people.
Spraying, assembly, quality and every decision about the furniture.
Safe by design.
Fenced cells, a light curtain at the open side, and a stop the moment someone enters.
- Cell 1CNC loading
Boards on, parts off.
Takes boards from the saw cart onto the CNC table and the machined parts off to the next cart.
- Cell 2Paint line
The booth never waits for hands.
Puts sanded parts on the paint trolleys in the order the booth will spray them.
- Cell 3Palletising
Boxes stacked for the truck.
Stacks packed boxes on pallets, order by order, ready to load.
When a shop asks, the answer comes from the line, not from a guess.
The email agent drafts replies with each order’s status from the ERP and the phase the order is in right now, from the line. The monitor flags the orders at risk before anyone has to ask.
Bonjour, où en est la commande 120418 ? Notre client attend sa livraison.
Bonjour Madame Martin, la commande 120418 (buffet ALBA, 2 pièces) est en séchage après la peinture. Le chargement est prévu jeudi 12 novembre et la livraison en semaine 47.
- Order and dates · ERP
- Phase right now · cameras
Orders at risk this week
Where each order is now, against the date it was promised
| Order | Now | Due | Risk |
|---|---|---|---|
| 120418 · ALBA | Painting queue | Thu | High |
| 120433 · COSTA | CNC 1 | Fri | Watch |
| 120402 · NORA | Assembly | Thu | On track |
| 120395 · ALBA | Packing | Wed | On track |
At the current pace, 120418 misses Thursday’s loading by about 40 minutes
The shop
A reply with the phase and the loading date.
In its own language, drafted for a person to check before it goes.
The planner
The line and the orders at risk, on one screen.
Where every order is, what waits in front of it, and what that means for its date.
The owner
Units per hour, stops and the week ahead.
The same numbers the line produces, without waiting for the end of the month.
Built in this order
- 01Orders
The order side.
Email agent, order board and lead times per product type.
- 02Monitor
Production in real time.
Every phase, queues and stops, delay risk and alerts.
- 03Sensing
Cameras and machines.
Units per hour counted, machines reporting their state.
- 04Robots
The three robot cells.
CNC loading, the paint line and palletising.
One system, from the inbox to the robot.
Thirty minutes are enough to walk your line with us and frame the first phase.